How to do Safe Man hour Calculations at the site!! Its so easy!!

Tutorial on Safe Man hour Calculations and lost time hours 


safe man hour calculations


Today's post is all about the safe man hour calculations at the site. Safe Man-hours shall be calculated from 1st of every month to end of the month.

The man hours worked per month shall be calculated based on the formula:

Total Man hours Worked in a day = (No. of  Workmen worked in a day x No. of Man hours worked in a day ) +   O.T

O.T = (No of O.T hours x No of workmen on overtime) 

Total man hours worked for the month = Sum of total man hours
worked in a day for the month.


Lets See An example for the Safe Man hour Calculations 


If 10 workmen working for 8 hours on 1st day without overtime
Total Man hours Worked on 1st day = 10 x 8 = 80 hrs
If 15 workmen working for 8 hours on 2nd day without overtime
Total Man hours worked on 2nd day = 15 x 8 =120 hrs

.
.

If 50 workman working for 8 hours on 31st day without overtime
Total Man-hours worked on 31st day = 50x 8 = 400 hrs
Total man hours for this month = 80+120+.......................+400 (hrs)
                               = value

To Calculate Man hours lost :

Man hours lost by each and every workman shall be calculated and the cumulative shall be added.

For example:-

No of man-hour lost by one workman for the month = 5 hrs
No of man-hour lost by second workman for the month  =3 hrs
Total Man hours Lost = 8 hrs

To Calculate Cumulative Man hours Worked :


Cumulative man hours worked = 

Cumulative Man hours worked for the previous month + Total Man hours worked for the present month.